Beta Safety Systems were asked to survey and provide a proposal for the cleaning of the external cladding and windows on the LC Building at the University of Surrey. 
The natural process of weathering over the years since the buildings construction had resulted in the build-up of dirt, algae and moss on the external gold and brown facade cladding. 
 
Examples of the condition of the facades is shown below 
 
 
 
 
The incorporation on these products within the building allowing the end user of the building to work confidently at height both during construction and during future maintenance of the building. 
 
All installation works were completed on time and in line with the agreed scope of works agreed with our client. 
 
Beta provided a quotation to the University for cleaning of the external facade using roped access technicians with the following provisions: 
 
Level 3 Irata trained rope access team 
Rigging operations to allow access to the facade 
Cleaning of all the external facade cladding using neutral ph detergents 
Traditions window cleaning techniques 
Reach and wash systems use 
 
 
The results of the clean were impressive and Perry Petworth was pleased with the results that were achieved by the Beta team. 
 
Photographs of the works undertaken are shown below: 
 
Before cleaning 
After cleaning 
 
Window ledge transformation during clean 
 
The completion of the work has a beautiful restored external façade in a condition that shows the building as it was originally intended to be seen. 
 